# OB-DB-008 — The ASPSP tells the TPP about every change

> The ASPSP tells the TPP without undue delay about any change the user makes in the dashboard, withdrawal included.

- Article: PSR 43(4)
- Who is bound: ASPSP
- Who it is for: API
- Application: 21 months after entry into force, the general application date (Article 112).
- Level 2: RTS under Article PSR 89(1)(e), draft due at T + 12 months.
- Origin: New, with no equivalent in PSD2 or in the 2018 RTS.

Provisional numbering of the April 2026 compromise (Council doc. 8221/26). The final numbering will be added when the Official Journal publishes the text, without changing the id.

## STET 1.6.3: Partial

STET has neither a consent status to query nor a notification. A withdrawal revokes the refresh token, and the AISP only finds out from the `invalid_grant` error on its next refresh.

- <https://openfinanceguide.com/en/stet/1.6.3/framework/3-prerequisites-and-technical-details>
- <https://openfinanceguide.com/en/stet/1.6.3/endpoints/aisp/consents-put>

## Sources

- [Council doc. 8221/26, page 260](https://data.consilium.europa.eu/doc/document/ST-8221-2026-INIT/en/pdf#page=260)

Checked on 2026-10-04. https://openfinanceguide.com/en/dsp3/obligations/ob-db-008
